PASEO DEL RIO
Location: Los Angeles, CA
Client: County of Los Angeles Ms. Mie Akamatsu Joness, PLA 310.306.2027
Completed: Novemebr 2008
Construction cost: $210,000 (contract value)
This project was the second phase of multiphased improvements to the Rio Hondo and San Gabriel Coastal Basin Spreading Grounds located in the City of Pico Rivera. This phase improved access into the Spreading Grounds for passive recreational use and included a ¾ mile long greenbelt with native planting, trails, enhanced rest areas, interpretive signage, and security lighting. This $2.2 million construction cost was within the County’s budget. Sustainable practices utilized: •Native and drought tolerant plants •Decomposed granite for walkway •Recycled materials •Grouped plants with similar water needs
Installed moisture sensors in irrigation system
Encouraged watering without run off Other goals included:
Enhanced landscaping
Design inviting rest areas
Create interpretive signage
Install security lighting